The significance of the project: The realization of the project of construction of hydro power plant Burfell 2, with installed capacity of 270 MW, was...
pročitaj višeThe significance of the project: Responsibility for the construction of 220 kV transmission line Þeistareykjalína 1 and 220 kV Kröflulína 4 imposed a new factory...
pročitaj višeThe significance of the project: Installation 245/132/12 kV GIS facility in the SS "Krafla 49", within a geothermal power plant "Krafla", which provided the connection...
pročitaj višeThe project significance: Transmission line 220 kV Sigöldulína 3 is strategically very important transmission line, which connects the four hydro power plants with the two...
The significance of the project: The realization of the project of construction of hydro power plant Burfell 2, with installed capacity of 270 MW, was...
pročitaj više