Macedonia / Naše reference

Makedonija

Reconstruction of a 400 kV transmission line with a corridor 10

The significance of the project:  Reconstruction of the 400 kV transmission line from the substation Dubrovo to the Macedonian-Greek border has created conditions for the...

pročitaj više
Makedonija

400, 220 and 110 kV transmission lines

The project significance Electricity Transmission System Operator of Macedonia (MEPSO) during 2009 entered the process of modernization of the existing electrical transmission network in the...

pročitaj više
Makedonija

110 kV transmission line Skoplje 1–Kumanovo 1

The project significance This is one of the major projects in the process of modernizing and strengthening the electric power system of Macedonia, its expansion...

pročitaj više
Makedonija

Wind farm Bogdanci

The project significance The wind farm Bogdanci is the first wind farm in Macedonia. It was built in an area of 29 hectares, has sixteen...

pročitaj više