Skip to content

Wind Farm Ivan Sedlo – SCADA System

Ivan Sedlo Wind Farm is the first wind farm in the Sarajevo Canton and represents a significant step in Bosnia and Herzegovina’s energy transition.
ELNOS GROUP

Project Significance

Ivan Sedlo Wind Farm is the first wind farm in the Sarajevo Canton and represents a significant step in Bosnia and Herzegovina’s energy transition. With an installed capacity of 25 MW, it produces approximately 65.7 GWh of electricity annually, supplying over 26,000 households and reducing CO₂ emissions by around 500 tons per year.

SCADA Systems
Mrkajići, BiH
ELNOS GROUP

Elnos Group’s Role

Elnos Group was engaged in the design and implementation of the SCADA system for this wind farm. Our work included:

  • Designing the SCADA system to monitor and control all operational processes of the wind farm.
  • Integrating Zenon Energy software for flexibility and support of various communication protocols.
  • Configuring the communication infrastructure and PLC connectivity.
  • Managing data engineering, including testing and commissioning.
  • Implementing centralized remote monitoring and control via network connections, enabling supervision from any location.

General Information

Year 2024–2025.
Investor Interenergo d.o.o. (Kelag Grupa, Slovenija)
Glavni ugovarač Interenergo d.o.o. (Kelag Grupa) – Suzlon Wind Energy BH
Status Završeno
Location Mrkajići, BiH