Elnos Group – A leader in the construction of modern substations

Elnos Group is a leader in the construction of modern substations that connect energy systems and ensure reliable power transmission. Substations represent a key component of our portfolio and form the backbone of a secure and stable energy future. Our expert teams have delivered numerous substation projects across the region and throughout Europe, positioning us as a trusted partner for energy utilities and private investors.

Turnkey Solutions

Comprehensive “turnkey” services

Our services cover every phase of substation project delivery:

Air-Insulated Substations (AIS)

AIS Substations

Our expertise in AIS projects includes work in ten countries. Selected major projects include:

  • Tuna Substation, Sweden: Reconstruction of a 400/220 kV substation.
  • Güssing Substation, Austria: Construction of a new 110/30/20 kV substation.
  • Grant Project, Montenegro: Reconstruction of 15 substations (400 kV, 220 kV, and 110 kV).
high-voltage direct-current

HVDC Projects

Our work on HVDC converter stations – key components of the integrated European energy market – deserves special attention:

  • Emden, Germany: Installed capacity 900 MW, voltage level ± 320 kV DC. As a subcontractor to Hitachi Energy, we carried out complete electromechanical installation works for the DolWin 5 interconnection project.
  • Ertsmyra, Norway: Installed capacity 1,400 MW, voltage level ± 515 kV DC. As a subcontractor to ABB, we executed installation works for the NordLink interconnection (623 km).
  • Lastva Grbaljska, Montenegro: Installed capacity 1,000 MW, voltage level ± 500 kV DC. As a subcontractor to TOSHIBA, we performed installation works for the MONITA interconnection between Italy and Montenegro (582 km).
Gas-Insulated Substations

GIS Substations

We have also distinguished ourselves in delivering high-quality GIS substation projects. Key references include:

  • Krafla 49 Substation, Iceland: Electromechanical works on a 245/132/12 kV GIS substation at Iceland’s largest geothermal power plant (60 MW).
  • GIS Belgrade 44 – Surčin, Serbia: Construction of the new 110/35 kV substation — complete turnkey electromechanical works.
  • Centar Substation, Slovenia: Reconstruction — new 110/10 (20) kV GIS and MV facilities, electromechanical installation works without equipment supply.