- Zemlja: Netherlands
- Lokacija: Terneuzen, southwest of the Netherlands
- Godina: 2020.
- Investitor: Calcit Zeeland B.V, Netherlands
- Status: completed project

Significance of the project:
We performed the first project of the Elnos Group at the Dutch market in the field of industrial infrastructure. With its successful implementation, it has provided a power supply to the “Calcit” factory in the Netherlands.
ENS works:
The task of the team Elektro novi sistemi Slovenia (ENS) was to perform three stages of works: execution of works to enable power supply for the plant, production, and installation of electrical cabinets and procurement and installation of the ventilation system.
Within this project, ENS teams realized the installation of high-voltage connections from the distribution network, together with the MV distribution plant and power transformers, and connected the energy distribution cabinets with all control connections.
This project is one of our first significant breakthroughs into the EU market, considering the plants of the new factory where we have installed 33 electrical cabinets produced in the electrical mechanical workshop Elnos BL Banja Luka, which are CE marking products and are in compliance with European directives.