Significance of the project:
This is the first Elnos Group project in the German market. By realizing the construction of the new 380 kV transmission line Audorf-Flensburg, the transmission line connection between the Audorf and Flensburg substations, which were previously connected by a 220 kV transmission line, has been strengthened.
Elnos Group works:
Within the project construction of a 380 kV double circuit transmission line Audorf-Flensburg; our teams successfully performed stringing of OPGW and conductor on three sections.