Construction of new 400 kV TS Kragujevac 2-TS Kraljevo 3 transmission line

  • Zemlja: Serbia
  • Lokacija: Kragujevac, Kraljevo
  • Godina: 2020-2021
  • Investitor: Elektromreža Srbije
  • Status: finished
  • Dužina: 16 km

The project significance:

Construction of 400 kV transmission lines TS Kragujevac 2-TS Kraljevo 3 is one of the first phases of construction of the Trans-Balkan Power Corridor through Serbia.
The realization of the project to build this power line will bring a new level of security and stability of electricity supply in Western Serbia, while bringing together the markets of Eastern and Western Europe.

Elnos Group works:

Our team performed work related to preparing foundation, building foundations, tower erection and stringing.
This is a project in which we performed the installation: phase conductors, protective ropes, glass insulators, equipment and OPGW. We also did the procurement of 681 tonnes of phase conductor, as well as 51 tonnes of conventional protective rope for the entire route, on which a total of 174 transmission line towers are installed. The towers are Y-type steel bars, and their total weight is 2,156 tonnes.
We are especially proud of the fact that within this project we have implemented control of environmental protection measures and occupational safety and health measures on the entire transmission line route.