- Zemlja: Bosnia and Herzegovina
- Lokacija: Ugljevik, RS-B&H
- Godina: 2018.
- Investitor: Mine & TPP Ugljevik, RS-B&H
- Glavni ugovarač: Rudis and Mitsubishi Hitachi Power Systems
- Status: finished

The project significance:
RiTE Ugljevik has successfully implemented a comprehensive process of building a flue gas desulphurization system, which was one of the largest environmental projects in Southeast Europe. This is a procedure of transforming thermal power plant in Ugljevik from being a big polluter to one of ecologically cleanest plants in region. This is one of the most important projects in order for thermal power plant to continue its operation.
Thermal Power Plant Ugljevik uses coal with high percentage of Sulphur (3.5-5%) for production of electrical power. After completion of this project, emission of Sulphur oxides into atmosphere shall amount to about 400 milligram per cubic meter, compared to the previous 20 thousand milligrams.
Elnos Group works:
Size and complexity of the project is best described by the fact that our teams laid 120 kilometers of different types and diameters of cables. Before this, they had to mount more than five kilometers of cable cabinets and bearings.
More precisely, our teams were tasked with the following: performance of electrical installations of general consumption, lighting, installation of weak current, delivery and mounting cable cabinets, delivery, laying and connection of MV, LV and control cables for almost entire plant, construction of entire lightning installations, as well as delivery and assembly of distribution and UPS cabinets. Special challenge for out team was work on the top of 100 meters high new chimney, which he did successfully.