Construction of new 130 kV TS Saxen-Flatenberg

Elnos Group works:

On the project of building a new transmission line 130 kV Saxen-Flatenberg Elnos Group performed the works of installation phase conductors and OPGW. The total length of TL is about 25 km, and the installation was completed for a month. At existing wooden towers we installed the conductors 910 mm2, OPGW 125 mm2 and earth wire Dotteral 142 mm2.

General Information

Year 2014.
Investor Vattenfall Eldistribution AB, Sweden
Glavni ugovarač Linjemontage and Grastorp AB, Sweden
Status works completed
Country Sweden