- Zemlja: Sweden
- Godina: 2014.
- Investitor: Vattenfall Eldistribution AB, Sweden
- Glavni ugovarač: Linjemontage and Grastorp AB, Sweden
- Status: Finished

Elnos Group works:
On the project of building a new transmission line 130 kV Saxen-Flatenberg Elnos Group performed the works of installation phase conductors and OPGW. The total length of TL is about 25 km, and the installation was completed for a month. At existing wooden towers we installed the conductors 910 mm2, OPGW 125 mm2 and earth wire Dotteral 142 mm2.