Construction of new 130 kV TS Saxen-Flatenberg

  • Zemlja: Sweden
  • Godina: 2014.
  • Investitor: Vattenfall Eldistribution AB, Sweden
  • Glavni ugovarač: Linjemontage and Grastorp AB, Sweden
  • Status: Finished

Elnos Group works:

On the project of building a new transmission line 130 kV Saxen-Flatenberg Elnos Group performed the works of installation phase conductors and OPGW. The total length of TL is about 25 km, and the installation was completed for a month. At existing wooden towers we installed the conductors 910 mm2, OPGW 125 mm2 and earth wire Dotteral 142 mm2.