Project overview

After successful solar projects in Croatia, Elnos Group has completed one of the first major solar power plants in Bosnia and Herzegovina – the Medeno Polje solar power plant. Covering an area of 5.23 hectares near Bosanski Petrovac, this facility marks a significant step forward in the development of renewable energy sources in BiH.

From March to September 2023, Elnos Group teams executed the project on a turnkey basis, covering all phases from design to commissioning. Medeno Polje contributes to strengthening the country's energy independence and reducing CO₂ emissions through the production of clean electricity.

Solar Power Plants
Bosanski Petrovac
Elnos Group

Technical characteristics

  • Installed capacity: 4.91 MWp
  • AC output power: 4 MW
  • Number of solar panels: 7,448
  • Total site area: 5.23 ha
  • Project type: Turnkey
  • Annual production: 5.4 GWh

The solar power plant uses advanced photovoltaic modules optimized for varying weather conditions. High-efficiency inverters ensure optimal energy conversion and stable delivery to the grid.

Elnos Group

Project challenges

Construction in the karst region of Medeno Polje brought several technical and logistical challenges:

  • Specific geological terrain requiring precise design and stabilization of support structures
  • Optimization of panel orientation for maximum production across all seasons
  • Integration with the power grid, requiring precise synchronization with existing transmission systems
  • Compliance with environmental regulations and biodiversity protection standards
Uloga Elnos Grupe

Elnos Group’s role

Elnos Grupa nije bila samo izvođač ovog projekta – djelovala je kao Solution provider, što Solution provider approach

Elnos Group acted not only as a contractor but as a solution provider, delivering a complete concept even before the design phase. This ensured optimized technical solutions and improved project execution efficiency.

Our role included:

  • Turnkey design and construction
  • Installation of solar panels and supporting structures
  • Installation of inverters and connection to transformer stations
  • Laying and connecting AC and DC cables
  • Implementation of SCADA for remote monitoring and control
  • System testing and performance optimization prior to commissioning

Project Manager Nenad Marjanović stated:

“Our teams carefully installed every component of the solar plant, ensuring precise placement of all panels and their optimal positioning toward the sun. Every segment of the system was thoroughly tested to ensure maximum efficiency and reliability.”

Elnos Group

Strategic importance

  • Increasing renewable electricity production in BiH
  • Strengthening energy independence by reducing reliance on imported power
  • Long-term reduction of CO₂ emissions
  • Opening opportunities for further solar development in the region
  • Supporting EU-driven energy transition goals

The Medeno Polje solar power plant sets the foundation for the future growth of solar energy in Bosnia and Herzegovina, while reinforcing Elnos Group’s position as a leader in renewable energy projects across the Balkans. The project brings economic and environmental benefits and marks an important milestone in the region’s energy transition.

General Information

Year 2023.
Investor "Soho", Bosanski Petrovac
Status Završeno
Location Bosanski Petrovac
Ukupna površina 5,23 ha
Godišnja proizvodnja 5,4 GWh