- Zemlja: Czech Republic
- Lokacija: Prague, Czech Republic
- Godina: 2023-2025.
- Investitor: ČEPS, Prague
- Status: In progress

Significance of the project:
The reconstruction of the 400 kV transmission line V-413 will ensure a safer supply of residential and commercial properties in the wider area of the capital city of the Czech Republic.
Elnos Group works:
Elnos Group will perform the disassembly of the entire transmission line, then the reconstruction and construction of a new transmission line at the same route with a total length of 37.69 km.