- Zemlja: Sweden
- Lokacija: Sweden
- Godina: 2012.
- Investitor: Vattenfall, Sweden
- Glavni ugovarač: Ratel Enterprenad, Sweden
- Status: Finished
- Dužina: 33 km

Elnos Group works
Elsno Group works included installation of OPGW rope of 142 mm2 and installation of conductors of 910 mm2 on the existing poles. The total length is 30 km and a special challenge to our colleagues represent a fairly inaccessible terrain which is mostly under water, woody and very rocky.
In the same time we finished works on the facility in 400 kV substation Hallsberg, which is covered the disassembly of five tension fields and installation of one new tension field.