2×130 kV transmission line Barkeryd–Nässjö

  • Zemlja: Sweden
  • Lokacija: Sweden
  • Godina: 2012.
  • Investitor: Vattenfall and E.ON, Sweden
  • Glavni ugovarač: Ratel Enterprenad, Sweden
  • Dužina: 11 km

The project significance

This is one of our first projects at the Swedish ground and it is very important and represents an important move of Elnos Group toward Nordic and EU markets.

Elnos Group works

On the trans­mission line 2×130 kV Barkeryd – Näss­jö Elnos Group were executed complete works, that is, demounting of the existing poles, phase conductors and protec­tive ropes, then: mounting and lifting the poles, installation of two systems of phase conductors and installation of OPGW rope.

During the project in front of us were standing many challenges. The terrain itself is extremely specific and demanding, with many lakes and natural bogs and sloughs. Routes of the transmission lines was very demanding with many crossings with other existing trans­mission lines, local roads and motor­way. As well, the routes pass through many historical findings which can be found in the City of Nässjö and its sur­rounding in abundance.