35/10 kV power transformer station Danilovgrad

  • Zemlja: Montenegro
  • Lokacija: Danilovgrad
  • Godina: 2012./2013.
  • Investitor: Elektroprivreda Crne Gore
  • Status: Finished

The significance of the project

New power transformer station 35/10 kV with power 2×12,5 MVA, Landža in the center of Danilovgrad was built in March 2013 with the aim of replacing the existing power transformer station that was built 50 years ago.

Apart from built-in modern and reliable equipment, the new power transformer station has larger capacity with respect to the old one. Instead of two transformers of 8 MVA each, two new transformers were installed with power of 12,5 MVA each. In this way, apart from connection of new consumers, industrial development and improvement of Montenegro is enabled as well.

Elnos Group works

Project is realized by the turnkey system. Elnos Group made the main project, installed and connected the whole electrical equipment and completed examination, parameterization and commissioning of complete substation.

New power transformer station Landža is equipped with plant that is isolated with SF6 gas (GIS) and armored in metal. On 35 kV side there are 8 cells of GHA type with two systems of buses and microprocessing protection device of the type SEPAM 60. Also, local SCADA microprocessing protection device of the type VIEW 4 was installed in cooperation with the Institute “Mihajlo Pupin“, as well as energetic transformers.