- Zemlja: Montenegro
- Lokacija: Tivat-Kotor
- Godina: 2016.
- Investitor: Crnogorski elektroprenosni sistem
- Status: Finished
- Tip: "Turn-key"

Project importance:
Construction of new 110 kV transmission line Tivat-Kotor significantly improved provision and increased reliability in supply of Kotor area with electrical power. At the same time, realization of this project created better conditions for development of tourism in this part of Montenegrin seaside.
Elnos Group activities:
In this project, Elnos Group showed capability to integrate all realization phases of one big project – from design to physical performance. This business endeavor engaged Elnos Group members from Serbia, Montenegro and BiH.
Entire project was successfully performed in spite huge obstacles caused by extremely unapproachable geographic terrain during its realization.
New transmission line Tivat-Kotor was designed on purpose so that, in future, it could accept transmission line from substation 400 kV Lastva (Grbaljska), which is under construction, on the way to substation Kotor (Škaljari).