Project importance:
Construction of the Mini Hydro Power Plant Bočac 2 is a development project of multiple significances for electrical power economy in the RS as well as economy of Mrkonjić Grad. This is electrical power facility where the state-of-art specific technical solutions are built in. Installed power of the MHPP Bočac 2 shall be 10 MVA, and designed annual production of this mini hydro power plant shall be 41.6 GWh.
Elnos Group activities:
Participation in construction of the Mini Hydro Power Plant Bočac 2 is one of the most demanding and most attractive projects for the Elnos Group. Mini Hydro Power Plant Bočac 2 is the first construction project where Elnos Group leads entire electrical-mechanical and hydro-mechanical phase.
Special technical specific works of the MHPP Bočac 2 refer to performance of works on turbine generator, which shall be merged in water completely.
We perform the project as the Main Contractor in cooperation with the Investor ZP Hidroelektrane na Vrbasu a.d. Mrkonjić Grad and out consortium partner Andritz Hydro S.A.S.