- Zemlja: Iceland
- Lokacija: Region of northern Iceland
- Godina: 2017.
- Investitor: ”LANDSNET”, Iceland
- Glavni ugovarač: "GE Grid" Switzerland
- Status: completed
The significance of the project:
Installation 245/132/12 kV GIS facility in the SS “Krafla 49”, within a geothermal power plant “Krafla”, which provided the connection between the 220 kV transmission line from the existing transformer station of the geothermal power plant.
Elnos Group works:
Elnos Group has conducted a complete electrical installation works with the installation of the compressor system, installation of double ground of cable racks and subconstruction and complete testing of substation “Krafla 49”.