The project significance
Initiation of production in the new plant “Dubicotton” is placed among the largest spinning mills in Europe. By constant investment in modern machines and technological equipment and constructive adaptation of the facilities, “Dubicotton“ rapidly acquired the largest production capacity for cotton and viscose fibers refinement in South-East Europe.
Elnos Group works
New production plant, a facility that includes 7.500 m2 areas was constructed. Within the new building Elnos BL constructed the substation 20/0.4 kV2x2000 kVA Dubicotton 2 and executed the installation of lighting, power sockets for common purpose and busbar distribution for technological consumers. Under the substation Dubicotton 2 two power transformers were delivered and have been installed with nominal transmission ration 20/0.4 kV and nominal power 2×2000 kVA manufacturedby Zuchinni. MV distribution switchgear was delivered and installed with two transmission line cubicles; measurement and cable line cubicles manufactured by SEL. Works also included reconstruction of MV switchgear with three transformer cubicles. LV switchboard and cabinets for general consumption were delivered and installed. LV switchboard was equipped with two fields for automatic compensation of reactive power, for each transformer field 450 kVAr.