Reconstruction of 130 kV substation Bergasjön

The project significance:

This substation shall be key and the only junction point for connecting wind park Grönhult (70 MW) to electrical power network of this country. In addition, the construction of the Bergasjön substation will improve the stability of the power system in the southern part of Sweden.

Elnos Group works:

New substation consists of two 130 kV transmission lines and two transformer bays. In the frame of the project, our teams are entrusted with performing activities of entire assembly and connecting of the equipment.
The assembly of entire steel structure, switchers, grounding units, busbars, primary connections, and laying and connecting cables in entire substation is in progress. Apart from this, our teams are responsible for performing and assembling cabinets for protection and control, connecting cables, assembly and connecting MV cells in entire substation, both on 130 kV and 30 kV voltage level.

Osnovne informacije

Godina 2021-2022
Investitor Eitech Engineering AB
Glavni ugovarač Omexom, Sweden
Status in progress
Zemlja Sweden
Lokacija Sweden