Reconstruction of seven MHPP

  • Zemlja: Serbia
  • Lokacija: region of Western Serbia
  • Godina: 2016/2017.
  • Investitor: Elektroprivreda Srbije

Project importance:

Aim of reconstructing seven mini hydro power plants in the territory of West Serbia is to increase their capacity and reliability in work. Reconstruction of MHPP in the territory of West Serbia shall increase production capacities of the power plants, achieve their reliability in work, decrease maintenance costs, improve electrical power situation and number of kWh gained from renewable energy sources.

Elnos Group activities:

Consortium of Elnos Group and KÖSSLER GMBH & Co KG, performed production activities, testing, delivery, installation and commission of electrical mechanical equipment within these seven old mini hydro power plants. Some of them started their work at the beginning of last century.

We performed automation of entire plants within mini hydro power plants, and, once project completes, it will be possible to supervise and control plants in all mini hydro power plants covered by the project from one location, i.e. dispatcher site.