Ugljevik Thermal Power Plant, B&H

  • Zemlja: Bosnia and Herzegovina
  • Lokacija: TPP Ugljevik
  • Godina: 2011.
  • Investitor: Elektroprivreda RS
  • Status: Finished

The project significance

The aim of project reconstruction of wastewater systems and the establishment of monitoring quality control of wastewater is to preserve their own facilities, improving water quality and environmental protection.

Reconstruction of facilities for wastewater treatment in TPP Ugljevik reduced negative impact on the quality of TPP Ugljevik at rivers quality, according to the legislation of the Republic of Srpska about discharge of wastewater into surface waters.

Elnos Group works

The project of reconstruction of wastewater systems are covered by industrial and sanitary hot waters of thermal power plant. It was completed the replacement system power pumps and other electrical equipment which are involved in the processing of waste water, as well as the modernization of the management system. It has been built five energy cabinets which through a divorce cassette MCC (Motor Control Center) deals with power and control of the pump system. Beside the energy cabinets, there have been built four control cabinets with a SCADA system management and control, mutually interconnected with optics.