Transmission line 220 kV Sigöldulína 3

  • Zemlja: Island
  • Godina: 2015
  • Investitor: Landsnet (islandski elektroprenos)
  • Dužina: 34 km

The project significance:

Transmission line 220 kV Sigöldulína 3 is strategically very important transmission line, which connects the four hydro power plants with the two largest aluminum factories in Reykjavik.

Elnos Group works:

The reconstruction project included the installation and towers erection, electrical installation works on the replacement of conductors 465 mm2 with the conductor 1145 mm2 and replacement of suspension equipment. Length of the route where these work done is 36 km.

Elnos Group team was faced with special professional challenges. Due to the significance of transmission line, the investor requested that the team must be ready any time, if it is necessary, to provide conditions and put transmission line under voltage within four hours. In addition to this, significant challenges for our workers were harsh weather conditions with daily heavy winds and rain. The project was successfully completed six days before the deadline.

Photos from this project