Lower Saxony, the epicentre of wind energy in Germany, is continuously upgrading its high-voltage network. The new 380 kV transmission line Conneforde–Cloppenburg–Merzen is a key asset for integrating renewable energy sources and strengthening grid stability.
Significance of the project: Ready to respond in transmitting substantial amounts of energy over long distances, with significantly minor losses, HVDC interconnections are increasingly becoming a global energy solution. After Montenegro and Norway, Elnos Group stepped into the construction project of the HVDC interconnection DolWin 5 in Germany. HVDC DolWin 5 will connect the new…
The project significance: This project has rejuvenated vital parts of the three-decade-old transmission line. Elnos Group works: In the city of Hilden, near Düsseldorf, our teams were engaged in the reconstruction of the 220/380 kV Eiberg-Opladen transmission line. The performed works included the replacement of tension insulating chains and suspension equipment on the 220 kV…
Significance of the project: This is the first Elnos Group project in the German market. By realizing the construction of the new 380 kV transmission line Audorf-Flensburg, the transmission line connection between the Audorf and Flensburg substations, which were previously connected by a 220 kV transmission line, has been strengthened. Elnos Group works: Within the…
Significance of the project: A need for the reconstruction of 380 kV transmission lines St. Peter Nord and the 220 kV transmission line Itterbach West came to the fore after several decades of this transmission line operations. The successful implementation of the project created long-term stability of the power supply around the city of Hilden…