One of the oldest transmission lines in Slovenia, the 110 kV Divača–Pivka–Ilirska Bistrica line, is retiring after 84 years of operation. This vital element of the southern Primorska region’s power infrastructure was built on the eve of World War II and is now receiving a fully modernized successor.
In the heart of North Macedonia, between the cities of Veles and Ovče Polje, reconstruction of a key 110 kV transmission line, originally built more than half a century ago, has been completed. This 21-kilometer-long line has now been modernized to ensure more stable and reliable electricity supply for the regions of Sveti Nikole and…
Southwestern Serbia is one of the areas facing the greatest power system challenges due to the growing demand for a stable electricity supply. The project for the construction of a double-circuit 110 kV transmission line between Kraljevo 3 and Novi Pazar 1 substations is of key importance for strengthening grid infrastructure and ensuring long-term energy…
As part of the modernization of Slovenia’s power transmission network, the reconstruction of the 110 kV Kidričevo – Ptuj – Formin transmission line was carried out. This project is significant as it represents one of the first implementations of ACCC® (Aluminum Conductor Composite Core) conductors in Slovenia, enabling a substantial increase in power transmission capacity…
Lower Saxony, the epicentre of wind energy in Germany, is continuously upgrading its high-voltage network. The new 380 kV transmission line Conneforde–Cloppenburg–Merzen is a key asset for integrating renewable energy sources and strengthening grid stability.
In the scenic landscape of Slovenia’s northern Primorska region, the reconstruction of the 2×110 kV Gorica–Divača transmission line included the creation of a key energy link at the Renče point. This project is part of Slovenia’s broader strategy to modernise its power infrastructure and connects substations 110/20/20 kV Sežana and 110/20 kV Vrtojba, forming the…
Denmark, known for its ambitious renewable energy goals, is constructing one of the largest transmission lines in the region – the 400 kV double-circuit Endrup–Idomlund–Endrup–German border transmission line. This project links the Danish and German power grids, enabling stable transmission of green megawatts from wind farms. Denmark is one of Europe’s leaders in the adoption…
The installation of a special HTLS conductor as part of the modernization of the 110 kV transmission line Podgorica 1 – Danilovgrad – Perućica will enable the Perućica hydropower plant (307 MW) to transmit up to 30% more energy into Montenegro’s power transmission system.
Significance of the project: The reconstruction of the 400 kV transmission line V-413 will ensure a safer supply of residential and commercial properties in the wider area of the capital city of the Czech Republic. Elnos Group works: Elnos Group will perform the disassembly of the entire transmission line, then the reconstruction and construction of…
The project significance: This project has rejuvenated vital parts of the three-decade-old transmission line. Elnos Group works: In the city of Hilden, near Düsseldorf, our teams were engaged in the reconstruction of the 220/380 kV Eiberg-Opladen transmission line. The performed works included the replacement of tension insulating chains and suspension equipment on the 220 kV…
The project significance: Construction of 400 kV transmission lines TS Kragujevac 2-TS Kraljevo 3 is one of the first phases of construction of the Trans-Balkan Power Corridor through Serbia. The realization of the project to build this power line will bring a new level of security and stability of electricity supply in Western Serbia, while…
The project significance: The new transmission line will play a significant role in connecting new wind parks from this part of the country to the power grid. The construction of a new power line will reduce the risks of network overload, but also from disruption in the supply of this area in the future. Elnos…