Transmission lines

Construction of transmission line 400 kV Hallsberg-Barkeryd

The significance of the project Project South West Link is the largest investment in the Swedish national grid in the last 30 years. The project is extremely important for the creation of a strong national network, which will be ready for future requirements for safe delivery of electricity and the integration of large wind farms.…

Read more

2×130 kV transmission line Barkeryd–Nässjö

The project significance This is one of our first projects at the Swedish ground and it is very important and represents an important move of Elnos Group toward Nordic and EU markets. Elnos Group works On the trans­mission line 2×130 kV Barkeryd – Näss­jö Elnos Group were executed complete works, that is, demounting of the…

Read more

130 kV transmission line Sidensjo-Moliden

The project significance In the area of Sidensjo it completed the construction of one of the largest wind farm in Sweden. Total installed capacity of the wind farm is 144 MW, and has 48 wind turbines. By using this renewable energy source per year it will reduce CO₂ emissions by 350,000 t. The new 130-kV…

Read more

130 kV transmission line Storfinnforsen–Isbillstjärn

The project significance Project of construction of these wind farms is one the largest industrial investments in Sweden. The investors are Norwegian Statkraft SCA Vind AB, SSVAB, and Sweden SCA. The investors plan construction of seven wind farms, and the total value of the investment is 2.4 billion USD. Complete project shall include surface of…

Read more

Construction of new 130 kV TS Saxen-Flatenberg

Elnos Group works: On the project of building a new transmission line 130 kV Saxen-Flatenberg Elnos Group performed the works of installation phase conductors and OPGW. The total length of TL is about 25 km, and the installation was completed for a month. At existing wooden towers we installed the conductors 910 mm2, OPGW 125…

Read more

130 kV transmission line Anglarna–Hofors

Elnos Group works Elsno Group works included in­stallation of OPGW rope of 142 mm2 and installation of conductors of 910 mm2 on the existing poles. The total length is 30 km and a special challenge to our colleagues represent a fairly inaccessible terrain which is mostly under water, woody and very rocky. In the same…

Read more

Reconstruction of a 400 kV transmission line with a corridor 10

The significance of the project:  Reconstruction of the 400 kV transmission line from the substation Dubrovo to the Macedonian-Greek border has created conditions for the release of the transport section of Pan-European Corridor 10, stretching from Demir Kapija to Smokvica, which is 28.2 kilometres long. Participation in projects that support the connection of parts of…

Read more

400, 220 and 110 kV transmission lines

The project significance Electricity Transmission System Operator of Macedonia (MEPSO) during 2009 entered the process of modernization of the existing electrical transmission network in the segment of replacement earth wire by OPGW. This project includes transmission lines voltage up to 400 kV, whose total length is about 380 km. Elnos Group works Elnos BL realized…

Read more

110 kV transmission line Skoplje 1–Kumanovo 1

The project significance This is one of the major projects in the process of modernizing and strengthening the electric power system of Macedonia, its expansion and increase of stability in electricity transmission. Elnos Group works On this transmission line the replace­ment of the existing conductor was made by the conductor with increased working temperature (GTACSR),…

Read more

Transmission line 220 kV Sigöldulína 3

The project significance: Transmission line 220 kV Sigöldulína 3 is strategically very important transmission line, which connects the four hydro power plants with the two largest aluminum factories in Reykjavik. Elnos Group works: The reconstruction project included the installation and towers erection, electrical installation works on the replacement of conductors 465 mm2 with the conductor…

Read more

Reconstruction of the 110 kV Kličevo-Brezna

The significance of the project: Krnovo wind farm is located on the same plateau (1,500 m), northeast of Nikšić, known as the Montenegrin Mountain Tibet. It produces between 200 and 230 GWh of electricity annually, which is more than six percent of total electricity production in Montenegro. In order to Krnovo wind farm become successfully…

Read more