Dabar Hydropower Plant is the largest hydropower project in the region and a key part of the broader “Gornji Horizonti” system. With an annual production of 251.8 GWh, it will significantly contribute to regional energy stability. The project is in the southern part of Bosnia and Herzegovina, near the borders with Croatia and Montenegro, and…
After successful solar projects in Croatia, Elnos Group has completed one of the first major solar power plants in Bosnia and Herzegovina – the Medeno Polje solar power plant. Covering an area of 5.23 hectares near Bosanski Petrovac, this facility marks a significant step forward in the development of renewable energy sources in BiH. From…
The project significance: RiTE Ugljevik has successfully implemented a comprehensive process of building a flue gas desulphurization system, which was one of the largest environmental projects in Southeast Europe. This is a procedure of transforming thermal power plant in Ugljevik from being a big polluter to one of ecologically cleanest plants in region. This is…
The project significance: The fact that the replacement of these plants has not been realized since the commissioning of the Ugljevik thermal power plant 36 years ago tells enough about the importance of the project. Elnos Group works: The complex project of replacing the 6 kV and 0.4 kV plants in Facility 64 took place…
The project significance: By constructing this substation, Company EFT Mine and Thermal Power Plant Stanari created all pre-conditions for closing the circle of independent system for production of electrical power, which, in the future, should lead to cease of powering this giant from the electrical power network of the Republic of Srpska. Elnos Group works:…
The significance of the project: The reconstruction of the transmission line 2 x 110 kV Banja Luka 6 Prijedor -Knežica represents a continuation of the reconstruction projects of transmission network from a large investment cycle, of our long-standing partner, Elektroprenos BiH. This is a project that will in the future provide long-term supply security and…
Project importance: Development of industrial zone in Aleksandrovac, Airport Mahovljani, as well as construction of Highway Banja Luka-Gradiška, led to need for construction of new substation in the area of Municipality of Laktaši. Construction of substation 110/20 kV Laktaši 2 provides better supply of electrical power for entire industrial zone within this local community. Elnos Group…
Project importance: Thermal Power Plant Stanari is the biggest individual investment and the first privately owned thermal power plant in BiH. Annual production of TPP Stanari amounts to 2 million MWh of electrical power, and its installed capacity amounts to 300 MWh. Within the series of testing generators before test operation commission, there was need…
Project importance: Construction of the Mini Hydro Power Plant Bočac 2 is a development project of multiple significances for electrical power economy in the RS as well as economy of Mrkonjić Grad. This is electrical power facility where the state-of-art specific technical solutions are built in. Installed power of the MHPP Bočac 2 shall be…
The project significance The construction of the highway Banja Luka-Doboj is connecting the highway Banja Luka-Gradiska with the Pan-European Corridor 5C. This highway is the most important infrastructure potential for further integration within the Republic of Srpska. The highway has two sections, Prnjavor-Doboj and Banja Luka-Prnjavor, which has a total length of 71.9 km. Within…
The project significance Hydro Power Plant Zvornik, one of the oldest within the Power Industry of Serbia, was built and put into operation six decades ago. Its revitalization is very important for the energy system of Serbia, because the lifetime of hydropower plant will be extended for an additional 30 years, and the installation of…