The main design and detailed design for the construction of a new power transformer station Agreement according to: FIDIC „Yellow book“ Related Content : reference movie Articles in magazines Info no. 5 ( pages 20 and 21) , Info no. 7 ( pages 20 and 21 ), and Info no. 8 ( 34 and 35)…
The project significance Factory “Jaksche plastic technology” produces plastic parts glass-fiber reinforced construction for construction machinery, cranes, recycling machines, cars and rail vehicles, waste management facilities and the like. In order to increase its production and installation Geiss Thermoforming machines (power 583.46 kW), it become necessary to build a new transformer station of larger capacity.…
The project significance Mini-hydro power plant “Zapeće” is the free flow hydro power plant with no accumulation and its operation is provided by automatically, unmanned with remote controlled. Installed capacity of this power plant is 3.4 MW and with planned annual production will be provided a sufficient amount of electricity to supply up to 5,200…
The project significance In the frame of the project Reconstruction of the local consumption within the HPP Bočac, it was constructed hydro generator of 710 kVA, which transfer produced energy through 35 kV transmission line, to 35 kV switchgear bus bars and then distribute it for local consumption through 35/0.4 kV auxiliary transformers afterwards. Home…
The significance of the project One in a series of projects of modernization of the oil refinery in Brod is the project of reconstruction of the substation P-20 (RU-6 kV and RU-0.4 kV). This project involved the reconstruction or modernization of the power plant part of a new line of oil refining – Section 31,…
The significance of the project TPP Stanari, 300 MW, is the first power plant of this type built on the territory of the former Yugoslavia after more than thirty years and is one of the largest investments in the energy sector of Bosnia and Herzegovina. Stanari substation was built for the connection of new power…
The project significance Highway Banjaluka-Doboj in length of 71.9 km is a key regional link in the Republic of Srpska and Bosnia and Herzegovina. The project is essential for the improvement of connections between Bosnia and Herzegovina and the network of pan-European corridors, including Corridor Vc and Corridor X in Croatia, across the highway Banja…
The project significance The newly built blending complex of Oil Refinery Modriča is a modern plant from new generations, which in the technological, productive and environmental terms, satisfied the highest European standards. The construction of the most modern complex of oil production in this region lasted for about two years. Elnos Group works Under the…
The significance of the project Project covered adjustment to a new control system − SCADA, with delivery and installation of necessary communication and control equipment as well as upgrade of the current control system. Elnos Group works Contract included making project documentation for construction and electrical phase, old equipment dismantling and installation of new equipment…
The project significance Initiation of production in the new plant “Dubicotton” is placed among the largest spinning mills in Europe. By constant investment in modern machines and technological equipment and constructive adaptation of the facilities, “Dubicotton“ rapidly acquired the largest production capacity for cotton and viscose fibers refinement in South-East Europe. Elnos Group works New…
The project significance The Stambolčić tunnel represents the shortest connection between Sarajevo and Pale to Goražde and Višegrad, as well as the shortest connection for companies and citizens of Prača with Pale and Sarajevo. For the inhabitants of Podgrab and Prača this main road is the lifeline for the existence in this area. The total…