The project significance The project “Heating Plant” Gradiška is the first significant energy capacity of district heating based on renewable energy sources in the RS and BiH. This project has brought positive economic and ecological effects, as well as improving the quality and reliability of user suppling. Also, this project created opportunities for new jobs.…
The project significance: City of Banja Luka is the biggest political-territorial units of the Republic of Srpska with an area of 1,239 km2. Public lighting is one of the most important segments of public utilities, which is extremely important for the citizens’ needs, both for safety reasons and to protect the property of citizens as…
The project significance Thanks to this reconstruction, enterprise of HE power plant on Vrbas, for the first time from commissioning of this power plant, in December 1981, has modernized switch equipment of 110 kV. Elnos Group works Within this reconstruction, Elnos BL is complete the replacement of measuring voltage transformers with new voltage transformers, replacement…
The project significance The reconstruction of the cooling water system is provided higher reliability and modernization of hydro power plant, and its service is extended from 30 to 40 years. The old system had been in operation since the start of hydro power plant in 1981. Elnos Group works During the repair of HPP Bočac…
The project significance The aim of project reconstruction of wastewater systems and the establishment of monitoring quality control of wastewater is to preserve their own facilities, improving water quality and environmental protection. Reconstruction of facilities for wastewater treatment in TPP Ugljevik reduced negative impact on the quality of TPP Ugljevik at rivers quality, according to…
The project significant Nora plast deals with remanufacturing of plastics, and places its products in regional and European markets. By the construction of the new building, whose area is about 3,800 m2, there were created conditions for increasing of production capacity from the current 3,500 tons per year for 25 to 30 per cent in…
The project significance Company Telecommunications of RS has introduced a new 3G technology, which allows customers to use a range of new services, and guarantee the speed and quality of transmission of voice and data. This has improved the capacity and achieved greater signal coverage by M: tel mobile network across the B&H. Elnos Group…
The project significance As part of this project it was replaced the most vital systems, beside the management system which enabling secure and stable operation of hydro power plant. By replacing of the existing systems, which are were exploited from the release of hydro power plant in operation in 1981, it is provided its stable…
The project significance: In mid-2008 the Oil Refinery in Brod started the long process of modernization of a number of projects. Elnos Group continuously participates in the process of modernization, and from this period include the project of replacing cables 6/10 kV with cables XHP 48 6/10 kV. By replacing the existing three-core cables a…
The project significance Power transformer station 400/220/110/x kV Trebinje is one of the largest facility in the former Yugoslavia. This important object was reconstructed and modernized under the project POWER III. Elnos Group works Elnos BL performed the reconstruction of primary and secondary equipment. This job involved the replacement of the complete secondary equipment at…
Since 1966, SHP Celex has been a proud manufacturer of paper hygiene products such as kitchen towels and toilet paper. The factory is in Banja Luka, where the paper machine produces approximately 40,000 tons of paper annually. SHP Celex decided to invest in the construction of a completely new wastewater treatment plant. This investment was…