Krivača wind farm (103 MW) is the first wind farm in Serbia built south of the Sava and Danube rivers. It is located in the Braničevo district, only six kilometres from the Đerdap Gorge and the Romanian border. This project represents a significant step in Serbia’s transition toward renewable energy sources and in increasing the…
Southwestern Serbia is one of the areas facing the greatest power system challenges due to the growing demand for a stable electricity supply. The project for the construction of a double-circuit 110 kV transmission line between Kraljevo 3 and Novi Pazar 1 substations is of key importance for strengthening grid infrastructure and ensuring long-term energy…
Banat is becoming the centre of Serbia’s green energy transition. Nearly five years after the municipality of Kovin became home to the largest wind farm in the Balkans – Čibuk 1 (158 MW) – construction of Čibuk 2 (154 MW) is beginning in its immediate vicinity. The synergy of these two wind farms will deliver…
The project significance: Construction of 400 kV transmission lines TS Kragujevac 2-TS Kraljevo 3 is one of the first phases of construction of the Trans-Balkan Power Corridor through Serbia. The realization of the project to build this power line will bring a new level of security and stability of electricity supply in Western Serbia, while…
The project significance: The Jajinci-Mala Krsna railway is part of the international rail Corridor 10, connecting six European states on the route from Austria to Greece. The goal of the reconstruction is clearly defined – to build modern rail infrastructure that will increase the speed of trains on this 58.8 km – long railway section…
The significance of the project: With the aim of creating a more efficient and safer transport, Belgrade has started a new and great project of reconstruction of the road from the Vuk monument to the Kalemegdan fortress. By the realization the project “Green Boulevard”, Belgrade will get a better fluidity of the road traffic,…
The significance of the project: Serbia is by the realization of this capital project building a wind farm Čibuk 1, the largest wind farm in the Balkan, made a huge twist towards a new energy era of renewable energy sources. With its 57 wind turbines and an installed capacity of 158 MW wind farm Čibuk…
Project importance: Spreader 12.000 is a modern mining machine, which is a part of the first “Green” project in mining field of the EPS. Project of its construction in the Mining Basin “Kolubara” is very important for development of mining and electrical power engineering sector in Serbia. Thanks to application of , coal in…
Significance of the project: The project reconstruction of Slavija Square, one of the largest and busiest roads of Belgrade, that means carried out a comprehensive job of modernizing tram and trolleybus network with the aim of creating the conditions for more efficient transport in the capital of Serbia. Elnos Group works: Elnos Group in the…
Project importance: The aim of realization of two reconstruction projects in Thermal Power Plant Kostalac, one of the most important thermal power plants in Serbia, was to have a positive impact on increase of technical efficiency and usage of production capacity for electrical power of this electrical power plant. Elnos Group activities: During this project,…
Project importance: Aim of reconstructing seven mini hydro power plants in the territory of West Serbia is to increase their capacity and reliability in work. Reconstruction of MHPP in the territory of West Serbia shall increase production capacities of the power plants, achieve their reliability in work, decrease maintenance costs, improve electrical power situation and…
Project importance: Construction of transmission line 35 kV Ovčar Banja-Međuvršje is the first electrical power facility of this kind realized in the Municipality of Čačak area in the last 30 years. Completion of this extremely demanding project ends the third phase of the project for revitalization of dams for the hydro power plants Ovčar Banja…