The project significance The construction of a new 35 kV transmission line Ovčar Banja-Međuvršje is completed system revitalization of the HPP Elektromorava, since it has been five years ago renewed generators at dams in Ovčar Banja and Međuvršje. The revitalization of dams and setting up a new TL, Elektroprivreda Serbia has extended the life of…
The project significant Power transformer station 110/35/10 kV Belgrade 18-Ralja was commissioned in 1982 and supplies the power for Šumadija region of Electric Utility Company Belgrade network through 35 and 10 kV network. This power facility has 2×31,5 MVA of installed power. New, modern equipment installed in the PTS Ralja provides consumers with significantly higher…
The significance of the project This is one of the largest and most important projects in Serbia. This substation is located on the route of the 400 kV connection of Western Europe with its southern parts and Turkey. This project is of great importance for the southeastern part of Serbia, where it will improve voltage…
The project significance After eleven years of work on the territory of the Republic of Serbia, Elnos BL Ltd. Belgrade has moved into a new, modernly equipped business premise. This enabled performing all business functions of the enterprise in one place. Apart from the office space, there are is a storage space, production of power…
The project significant With project of modernization power transformer station Ilićevo it secures all larger needs of end users, safe electric energy supply of wider city center and industrial zone. Besides, reconstruction and expansion of power transformer station Ilićevo at the same time represents modernization and improvement of plants. Elnos Group works Reconstruction and extension…
The project significance Smart City Novi Sad is the first realized project of this type not only on the territory of Serbia but in its environment as well. This technology includes integration of system with the possibility of digital data processing and communication systems into electroenergetic system, which enables the flow of information, remote command…
The significance of the project The project is being completed with the aim of replacement of the existing distance protection with modern digital protection. Elnos Group works The project includes: replacement of distance protection in six transmission lines bays 110 kV in the transmission line ring of mine Drmno and equipment installation in 110 kV…
The project significance Power transformer station Belgrade 5 was put into operation in 1961. During the NATO bombing it suffered significant damage, and its reconstruction was necessary in order to ensure a regular electricity supply. PTS 220/110/35 kV Belgrade 5 supplies vital parts of Belgrade, New Belgrade, Zemun and the environment. It is one of…
The significance of the project: Reconstruction of section Jajinci-Mala Krsna is part of the international railway Corridor 10 through Serbia, 58 kilometers long represents one of the priority projects for the Serbian railway network. Trains speed on this railway section Jajinci-Mala Krsna after the reconstruction will be increased from 50 to 120 kilometers per hour.…
The significance of the project: With the aim of creating a more efficient and safer transport, Belgrade has started a new and great project of reconstruction of the road from the Vuk monument to the Kalemegdan fortress. By the realization the project “Green Boulevard”, Belgrade will get a better fluidity of the road traffic,…
Project importance: Aim of reconstructing seven mini hydro power plants in the territory of West Serbia is to increase their capacity and reliability in work. Reconstruction of MHPP in the territory of West Serbia shall increase production capacities of the power plants, achieve their reliability in work, decrease maintenance costs, improve electrical power situation and…
The significance of the project: Reconstruction and modernization of this section includes the construction of new double-track, electrified railway from new Gilje halt to the entrance to the station Paracin. The reconstruction and modernization will improve the railway facilities in this line section Beograd-Niš, both technologically and by lowering overall maintenance costs. The new railway…