Skip to content

Serbia

Reconstruction and modernization of section Gilje-Cuprija-Paracin

The significance of the project: Reconstruction and modernization of this section includes the construction of new double-track, electrified railway from new Gilje halt to the entrance to the station Paracin. The reconstruction and modernization will improve the railway facilities in this line section Beograd-Niš, both technologically and by lowering overall maintenance costs. The new railway…

Read more

Reconstruction of Hydro Power Plant Bajina Bašta

The significance of the project Hydro Power Plant (HPP) Bajina Basta is the second largest in Serbia and provides eight percent of total electricity in the country. Hydroelectric power station is the flow hydro power plant, whose concrete dam, with a building height of 90.5 m and a length of 460 m, forms a large…

Read more

110 kV transmission line Požarevac-Petrovac

The project significant TL Pozarevac-Petrovac is one of the first 110 kV transmission line which has been built in Serbia. It was put into the operation in 1948, as well as on this line has not made major repairs. There was necessary reconstruction, in order to avoid frequently breakdowns of network in this part of…

Read more

Construction of Drinsko-limska HPP, the brench of the HPP Elektromorava

The project significance The construction of a new 35 kV transmission line Ovčar Banja-Međuvršje is completed system revitalization of the HPP Elektromorava, since it has been five years ago renewed generators at dams in Ovčar Banja and Međuvršje. The revitalization of dams and setting up a new TL, Elektroprivreda Serbia has extended the life of…

Read more

110/35/10 kV power transformer station Ralja

The project significant Power transformer station 110/35/10 kV Belgrade 18-Ralja was commissioned in 1982 and supplies the power for Šumadija region of Electric Utility Company Belgrade network through 35 and 10 kV network. This power facil­ity has 2×31,5 MVA of installed power. New, modern equipment installed in the PTS Ralja pro­vides consumers with significantly higher…

Read more

Construction of a new transformer station 400/110 kV Vranje 4

The significance of the project This is one of the largest and most important projects in Serbia. This substation is located on the route of the 400 kV connection of Western Europe with its southern parts and Turkey. This project is of great importance for the southeastern part of Serbia, where it will improve voltage…

Read more

Business premises of Elnos

The project significance After eleven years of work on the territory of the Republic of Serbia, Elnos BL Ltd. Belgrade has moved into a new, modernly equipped business premise. This enabled performing all business functions of the enterprise in one place. Apart from the office space, there are is a storage space, production of power…

Read more

110/35/10 kV power transformer station Ilićevo

The project significant With project of modernization power transformer station Ilićevo it secures all larger needs of end users, safe ele­ctric energy supply of wider city center and industrial zone. Besi­des, reconstruction and expansion of power transformer station Ilićevo at the same time represents modernization and improvement of plants. Elnos Group works Reconstruction and extension…

Read more

Smart City Novi Sad

The project significance Smart City Novi Sad is the first realized project of this type not only on the territory of Serbia but in its environment as well. This technology includes integration of system with the possibility of digital data processing and communication systems into electroenergetic system, which enables the flow of information, remote command…

Read more

Thermal power plant and mining Kostolac, Serbia

The significance of the project The project is being completed with the aim of replacement of the existing distance protection with modern digital protection. Elnos Group works The project includes: replacement of distance protection in six transmission lines bays 110 kV in the transmission line ring of mine Drmno and equipment installation in 110 kV…

Read more

220/110/35 kV power transformer station Belgrade 5

The project significance Power transformer station Belgrade 5 was put into operation in 1961. During the NATO bombing it suffered significant damage, and its reconstruction was necessary in order to ensure a regular electricity supply. PTS 220/110/35 kV Belgrade 5 supplies vital parts of Belgrade, New Belgrade, Zemun and the environment. It is one of…

Read more

Factory „Fiat Cars“ in Kragujevcu

The project significance On the grounds of the former car factory “Zastava” in Kragujevac, FAS (Fiat Cars Serbia) has built one of the most modern Fiat’s factory, which is among the most modern car factories in Europe. During the construction of the new production center, FAS is reconstructed factory plants, built new facilities and has…

Read more